Time-and-work questions treat a job as one whole unit and each worker as a rate — the fraction of the job done per day. Add rates when people work together; subtract for a leak or an opposing worker.
- 5 solved questions
- Step-by-step AI walkthroughs
- Key formulas included
Key formulas
If A finishes a job in a days, A's one day's work is a1
Together: one day's work =a1+b1, so time =a+bab
Men–days: M1D1=M2D2 for the same job (add hours per day as another factor if given)
5 solved Time and Work questions
A can do a piece of work in 10 days and B in 15 days. Working together, in how many days will they finish it?
Solution — answer B
Together their one day's work is 101+151=61, so they finish in 6 days.
4 stepsStep 1: **Individual Work Rates**
First, let's find out how much work each person does in one day. If A finishes the work in 10 days, A completes 1/10 of the work per day. Similarly, B completes 1/15 of the work per day.
Step 2: **Combined Daily Work**
When A and B work together, their daily work rates add up. So, their combined work per day is the sum of their individual rates: 1/10+1/15. To add these fractions, find a common denominator, which is 30. This gives us 3/30+2/30=5/30.
Step 3: **Total Time Taken**
The combined daily work simplifies to 5/30=1/6. This means that together, A and B complete 1/6 of the work each day. To find the total number of days they will take to finish the entire work, we take the reciprocal of their combined daily work rate.
Step 4: The answer
So the answer is (B) 6 days. The reciprocal of 1/6 is 6, meaning they will finish the work in 6 days when working together.
A can complete a job in 12 days. He works for 3 days and then leaves. What fraction of the job is left?
Solution — answer C
In 3 days he does 123=41 of the job, so 43 remains.
5 stepsStep 1: Daily Work Rate
First, figure out how much of the job A completes in one day. If A finishes the whole job in 12 days, then in one day, A completes 1/12 of the job.
Step 2: Work Done
A works for 3 days. To find the total work A completed, multiply the daily work rate by the number of days worked. Work done =3×(1/12).
Step 3: Simplify Fraction
Simplify the fraction of the job A completed. 3×(1/12)=3/12. This fraction can be simplified by dividing both numerator and denominator by 3, which gives 1/4.
Step 4: Remaining Work
The question asks for the fraction of the job left. If 1/4 of the job is completed, subtract this from the total job (which is 1). Remaining job =1−1/4.
Step 5: The answer
So the answer is (C) 43. When you subtract 1/4 from 1 (or 4/4), you are left with 3/4 of the job.
A and B together can do a job in 8 days, and B alone can do it in 24 days. How long does A alone take?
Solution — answer D
A's one day's work =81−241=121, so A alone takes 12 days.
4 stepsStep 1: Understand Work Rates
When solving work problems, it's helpful to think about how much of the job is done in one day. If someone completes a job in X days, their one day's work is 1/X of the total job.
Step 2: Calculate Daily Work
We know A and B together complete the job in 8 days. So, their combined one day's work is 1/8. B alone completes the job in 24 days, meaning B's one day's work is 1/24.
Step 3: Find A's Daily Work
To find how much work A does in one day, we subtract B's daily work from their combined daily work. A's one day's work =81−241.
Step 4: The answer
So the answer is (D) 12 days. Performing the subtraction, A's one day's work is 243−241=242=121. If A does 1/12 of the job per day, A takes 12 days to complete the job alone.
A is twice as efficient as B, and together they finish a job in 12 days. How long does B alone take?
Solution — answer B
If B does 1 unit a day, A does 2, so together 3 units a day. The job is 3×12=36 units, which B alone does in 36 days.
4 stepsStep 1: Define efficiency
Let's assume B completes 1 unit of work per day. Since A is twice as efficient as B, A completes 2 units of work per day.
Step 2: Calculate combined rate
When A and B work together, their combined work rate is the sum of their individual rates. This means they complete 1+2=3 units of work per day.
Step 3: Determine total work
They finish the entire job in 12 days, working at a combined rate of 3 units per day. So, the total work required for the job is 3×12=36 units.
Step 4: The answer
So the answer is (B) 36 days. Since B completes 1 unit of work per day, B alone would take 36÷1=36 days to complete the entire job.
A can do a work in 20 days and B in 30 days. They start together, but A leaves 5 days before the work is finished. In how many days is the work completed?
Solution — answer C
If the work ends in T days, A works T−5 days and B works T days: 20T−5+30T=1. Then 3(T−5)+2T=60, so 5T=75 and T=15 days.
5 stepsStep 1: Understand work rates
First, let's determine the work rate for each person. A can do the work in 20 days, so A's daily work rate is 1/20. B can do the work in 30 days, so B's daily work rate is 1/30.
Step 2: Define total time
Let T be the total number of days the work is completed. We know A leaves 5 days before the work finishes, so A works for T−5 days. B works for the entire duration, which is T days.
Step 3: Formulate the equation
The total work done is the sum of the work done by A and B. A completes (T−5)/20 of the work, and B completes T/30 of the work. Since the entire work is completed, we set the sum equal to 1: (T−5)/20+T/30=1.
Step 4: Solve for T
To solve for T, find a common denominator (60) and multiply the equation: 3(T−5)+2T=60. This simplifies to 3T−15+2T=60. Combine terms to get 5T−15=60. Add 15 to both sides: 5T=75. Finally, divide by 5 to find T=15 days.
Step 5: The answer
So the answer is (C) 15 days. The calculation shows that the total time taken to complete the work is 15 days, which matches this option.
Get exam-ready on Time and Work
Generate fresh time and work practice sets in Test Studio, get step-by-step AI explanations the moment you slip, and close the gaps in Socrative Mode.
- Step-by-step AI solutions
- Fresh practice sets on demand
- Guided Socrative Mode drills